All 02 - Post CoP Running Costs

Design for Decommissioning Database

All 02 - Post CoP Running Costs

 
  •                                                                                                                                                                                                                                        

    Inadequate turn down on seawater lift pumps. Post CoP demand is significantly less

  •                                                                                                                                                                                                                                        

    Provision of utilities after CoP as duty changes

  •                                                                                                                                                                                                                                        

    Fire water pumps duty for accommodation and helideck only may be unsuitable after CoP

  •                                                                                                                                                                                                                                        

    Poor reliability of cranes

  •                                                                                                                                                                                                                                        

    Operation of Platform cranes after CoP

  •                                                                                                                                                                                                                                        

    Accommodation not suitable for reduced manning for MMI or NUI status, inefficient and spreadout design

  •                                                                                                                                                                                                                                        

    Diesel supply from storage tanks to power generation and cranes to be retained when other users are isolated

  •                                                                                                                                                                                                                                        

    Diesel Storage inadequate for running power generation continuosly on diesel, requires excessive bunkering

  •                                                                                                                                                                                                                                        

    Requirement for platform IO become NUI or MMI after hydrocarbon removal to reduce running costs Instrumentation logic too complex for change to NUI status

  •                                                                                                                                                                                                                                        

    Existing systems not suitable to meet decomissioning duty requiring alternative/additional platform utility supply.

  •                                                                                                                                                                                                                                        

    Insufficient bedding capacity requiring alternative access to platform

  •                                                                                                                                                                                                                                        

    Control room operator needed 24 hours a day

  •                                                                                                                                                                                                                                        

    HVAC requirements change after removal of the gross hydrocarbon inventory

  •                                                                                                                                                                                                                                        

    During preparation for removal the number of platform crane lifts increases compared to normal operations

  •                                                                                                                                                                                                                                        

    Platform cranes not available throughout engineering down

  •                                                                                                                                                                                                                                        

    Compressed air demand reduces significantly after CoP.

  •                                                                                                                                                                                                                                        

    Life of Field Power Generation Strategy